Close Menu
Gaza Echo
    Gaza Echo
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Gaza Echo
    Home » Power Digitalization: Uzbekistan’s First Digital Substation Successfully Completed
    PR Newswire

    Power Digitalization: Uzbekistan’s First Digital Substation Successfully Completed

    February 20, 2025
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    Zafarabad 220kV Digital Substation in Jizzakh Province Delivered by Shanghai Electric, Marking a Significant Milestone in Its Commitment to Enhance Power Infrastructure and Promoting Digital Transformation in the Energy Sector

    ZAFARABAD, Uzbekistan, Feb. 20, 2025 /PRNewswire/ — The Zafarabad 220kV Digital Substation, Uzbekistan’s first digital substation built by Shanghai Electric (SEHK:2727, SSE:601727), has been successfully completed and commissioned. Located in Jizzakh Province, the state-of-the-art substation covers approximately 75,000 square meters and is expected to significantly enhance the power supply in eastern Uzbekistan.

    For more than two decades, Uzbekistan has struggled with ongoing shortages of natural gas and electricity, forcing a significant portion of its population to depend on traditional stoves and improvised heating methods to endure the severe winter months. Upon completion, the Zafarabad Digital Substation will play a key role in strengthening the region’s electrical grid and improving energy distribution in Uzbekistan. With a capacity of 400 megawatts, the new facility will effectively double the power supply to the Jizzakh region, ensuring the stability of electricity delivery to nearby industrial enterprises and residential areas.

    Advanced Technology for Optimal Performance

    The substation features two 250 MVA auto-transformers, developed and manufactured by Shanghai Electric, which will step down the voltage from the 220kV level of the higher power grid to 110kV for local distribution. This will provide reliable, high-quality electricity to the Jizzakh province, meeting the growing demand for power in this rapidly developing region.

    A key innovation in the Zafarabad project is the implementation of a fully digitalized system, which will greatly enhance the efficiency and safety of substation operations. The substation is equipped with advanced monitoring and data acquisition systems that reduce the need for on-site maintenance personnel and improve operational safety. In the event of an emergency, the system’s real-time monitoring capabilities can quickly locate faults and adjust the power load to prevent disruptions.

    A Testament to Shanghai Electric’s Capabilities

    Shanghai Electric was granted the turnkey project by the National Electric Grid of Uzbekistan in October 2021. As Uzbekistan’s first digital substation, the Shanghai Electric project team overcame numerous challenges, including collaboration across multiple parties, language barriers, and technical debugging. The team not only optimized project configurations but also provided thorough training. During construction, they coordinated efforts between Chinese and Uzbek teams, ensuring the timely completion of the project’s main infrastructure while achieving a remarkable three years of accident-free operations.

    For more information, please visit: www.shanghai-electric.com

    Logo – https://mma.prnewswire.com/media/2346204/Shanghai_Electric_logo.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/power-digitalization-uzbekistans-first-digital-substation-successfully-completed-302381440.html


    Related Posts

    ThreatBook Launches Best-of-Breed Advanced Threat Intelligence Solution

    September 29, 2025

    2025 Yidan Prize spotlights changemakers advancing complex systems literacy and multilingual education

    September 29, 2025

    Vantage Secures Triple Win at the 2025 Global Forex Awards – Retail

    September 19, 2025

    HUAWEI: Jointly Building High-Quality and Reliable Data Centers for the AI Era

    September 19, 2025

    HUAWEI eKit Unveils the Intelligent Office Solution to Propel SMEs into the Intelligent Era

    September 18, 2025

    CTI Questions the Industry’s Pass-or-Fail Culture, Urges Shift Toward Long-Term Trader Development

    September 18, 2025
    Latest News

    Abdullah bin Zayed meets Indian Foreign Minister in Mumbai

    October 20, 2026

    – His Highness Sheikh Abdullah bin Zayed Al Nahyan, Deputy Prime Minister and Minister of Foreign Affairs, met India’s Minister of External Affairs, Dr. Subrahmanyam Jaishankar, in Mumbai. The talks took place during a working visit to India that began

    UAE and French presidents discuss strategic cooperation

    October 20, 2026

    Magnitude 5.6 earthquake strikes near Khuzdar in Balochistan

    October 19, 2026

    Guterres urges urgent global action to protect biodiversity

    October 17, 2026

    Oil prices hit $110 a barrel on Middle East supply fears

    October 17, 2026

    Samsung unveils AI memory strategy and AMD CXL demo at OCP

    October 16, 2026

    Egypt remittances hit record $33.9 billion in eight months

    October 16, 2026

    Thailand floods kill 71 and hit nearly 909,000 households

    October 13, 2026
    © 2026 Gaza Echo | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.